Karun has the highest discharge among the rivers in Iran, while it is the longest river in the Country. The length of the River is 950km and the area of its catchment is 60.000km . Karun is the only River in Iran which is navigable by boat. The source of the Karun is called Abkaj, located on Zardkuh-e Bakhtyari Mountains . The River originates from the Zagros Mountain Range. After winging through mountainous areas and flowing into the Khuzestan Plain, it reaches an area named Gotvand. The Karun is divided into two branches in the north of Shushtar, joining each other again on the south of Shushtar. The main branch of the Karun is the Dez River , which is joins the Karun on the north of Ahvaz . The Karun joins the Arvand River on the Iranâ€"Iraq boarder, and eventually flows into the Persian Gulf .







Click here to join nidokidos

Click here to join nidokidos



Click here to join nidokidos



Click here to join nidokidos



Click here to join nidokidos




While Construction:


Click here to join nidokidos



Click here to join nidokidos



Click here to join nidokidos



Click here to join nidokidos



Click here to join nidokidos



Click here to join nidokidos

Click here to join nidokidos



Click here to join nidokidos



Click here to join nidokidos



Click here to join nidokidos



Click here to join nidokidos



Click here to join nidokidos



Click here to join nidokidos



Click here to join nidokidos



Click here to join nidokidos



Click here to join nidokidos



Dam Specifications:

Height from the foundation 205 (m)
Height from the river bed 185 (m)
Crest length 462/28 (m)
Crest level 850 (m)
Crest width 5.5 (m)
Width on the foundation 29/5 (m)
Total volume of concreting 1300000 (m )
Operational normal level 845 (m)

Reservoir:

Volume at maximum operational level of 845 (m) 2970 (Mm )
Volume at minimum operational level of 800 m 1250 (Mm )
Operational volume 1720 (Mm )
Non- Operational volume 1250 (Mm )
Water level during probable maximum flood (PMF) 851.5 (m)
Total area of lake at the maximum operational level 48/2 (km )
length of lake at the maximum operational level 60 (km)

Diversion Tunnels Diversion tunnel(No. 1) Diversion tunnel (No. 2)

Length 613 (m) 536 (m)
Internal diameter 13 (m) 13 (m)
Excavation diameter Apr.15 (m) Apr. 15 (m)
Cross section shape Hexagonal Horseshoe
Lining type Concrete Concrete lining (walls)
Number of gates 2 -
Discharge Capacity 1800 (m3/s) 1500 (m3/s)
Surface Excavation 191634 (m3) 198046 (m3)
Underground Excavation 120562 (m3) 104583 (m3)
Concreting 55567 (m3) 42695 (m3)
Lifting system Gantry crane of 280 tons -

 


 



Bookmark and Share
Iran Inaugurates The Karun-4 dam

 The objectives of the construction of Karun-4 Dam & Hydro-electric Power Plant

are electric Power supply and flood control.

watch the report

http://www.nidokidos.org/iran-inaugurates-the-karun-4-dam-t49803.html

Stop emails | Join Us by Email | Join from Web | Visit Yahoo! Group | Join Nidokidos Forum


__._,_.___
Recent Activity:
===================================================

Join nidokidos Group for best of forwarded mails
http://groups.yahoo.com/group/nidokidos
nidokidos-subscribe@yahoogroups.com



Be the part of Nidokidos , Join our Forum
http://www.nidokidos.org

===================================================
MARKETPLACE

Get great advice about dogs and cats. Visit the Dog & Cat Answers Center.


Hobbies & Activities Zone: Find others who share your passions! Explore new interests.


Stay on top of your group activity without leaving the page you're on - Get the Yahoo! Toolbar now.

.

__,_._,___

No comments:

  © Blogger templates The Professional Template by Ourblogtemplates.com 2008

Back to TOP